~60
tasks a month tracked with estimated vs actual time
About 60 buyer tasks a month flowed through Trello and private chats. Nobody knew how long each format should take, who was overloaded, or why tasks stalled.
Workload is visible in numbers rather than guesses, and there is data to build team KPIs on.
Set time standards per format: news-style up to 2 hours, tracking 1.5–2 hours, motion up to an hour, static 30 minutes, adaptation 10–20 minutes.
Hired through screen-recorded test tasks, so I could see both the result and the real working time.
Introduced daily creative reports: how many, for whom, what went wrong.
Moved the team to a CRM: every task has estimated vs actual time, and creatives flow into analytics automatically.
Took over the team with 1:1s for every designer, followed by regular check-ins.